Your laboratory must meet the following power requirements before you can schedule your system installation.
The data system typically requires two power sockets located adjacent to the system PC and monitor. You may require further outlets for optional equipment, such as a printer.
The system requires one power socket. Do not position the equipment in such a way that it is difficult to disconnect the power cord.
Waters recommends installing the system so that the supply cannot be inadvertently switched off.