Your laboratory must meet the following power requirements before you can schedule your system installation.
The data system typically requires two power sockets located adjacent to the system PC and monitor. You may require further outlets for optional equipment, such as a printer.
The system requires one power socket. Do not position the equipment in such a way that it is difficult to disconnect the power cord.
Waters recommends installing the system so that the supply cannot be inadvertently switched off.
Related topic:
需要協助嗎?聯絡Waters專家。
為避免引起人身傷害的風險和防止損壞實驗室設備,操作Waters產品時,請務必一律按照適用的操作和安全資訊,也務必遵守您所在組織的標準作業程序和當地法規。