Site preparation checklist

Site preparation checklist
Topic LCI-SPG-0057, 最近更新 09/26/2023

You must complete this checklist and return it to your Waters representative when all site preparation requirements are met.

Table 1. Customer confirmation
  • I confirm that all required supplies are available.
  • I confirm that an operator is available for demonstration and training by a Waters engineer during the installation.

    Indicate availability:

    • During the entire installation
    • During part of the installation: approximately ______% of the time
    Important: If the designated person cannot be present at the installation, notify your Waters representative so that we can reschedule the installation for a more convenient time.

Customer signature:

Date:


需要協助嗎?聯絡Waters專家。 


為避免引起人身傷害的風險和防止損壞實驗室設備,操作Waters產品時,請務必一律按照適用的操作和安全資訊,也務必遵守您所在組織的標準作業程序和當地法規。

回到頁首 回到頁首