The sample manager has a recommended maintenance schedule.
Users can perform the following routine sample manager maintenance procedures.
Maintenance procedure | Frequency |
---|---|
Replace the sample manager leak sensor | As needed |
Calibrate the needle z axis | After a needle change or as needed |
Replace the needle seal and seal port tubing | During scheduled routine maintenance or as needed |
Replace the needle | During scheduled routine maintenance or as needed |
需要協助嗎?聯絡Waters專家。
為避免引起人身傷害的風險和防止損壞實驗室設備,操作Waters產品時,請務必一律按照適用的操作和安全資訊,也務必遵守您所在組織的標準作業程序和當地法規。