Sample manager maintenance schedule

Sample manager maintenance schedule
Topic LCI-USG-0163, 最近更新 11/28/2023

The sample manager has a recommended maintenance schedule.

Users can perform the following routine sample manager maintenance procedures.

Maintenance procedure Frequency
Replace the sample manager leak sensor As needed
Calibrate the needle z axis After a needle change or as needed
Replace the needle seal and seal port tubing During scheduled routine maintenance or as needed
Replace the needle During scheduled routine maintenance or as needed

需要協助嗎?聯絡Waters專家。 


為避免引起人身傷害的風險和防止損壞實驗室設備,操作Waters產品時,請務必一律按照適用的操作和安全資訊,也務必遵守您所在組織的標準作業程序和當地法規。

回到頁首 回到頁首