Priming the pump

Priming the pump
Topic LCI-USG-0011, 最近更新 11/28/2023

Priming the pump is part of the system startup workflow on the touchscreen.

Priming prepares a new system for use or for a change in reservoirs or solvents. It also prepares a system for restarting after it is idle for more than four hours. During priming, the vent valve moves to the vent position, allowing flow to go to waste. The flow rate during priming is 10 mL/min.

Recommendation: Ensure that all solvents in solvent reservoirs A, B, C, and D are full and miscible.
Note: To prevent salts from precipitating in the system, introduce an intermediate solvent, such as water, when changing from buffers to high-organic-content solvents. Consult the solvent miscibility tables in the Solvent Considerations section of the system guide.

Ensure that the solvent reservoirs contain sufficient solvent for adequate priming and subsequent operation of the system, and that the waste container can hold all the used solvent. For example, at 10 mL/min, priming for two minutes uses about 20 mL of each solvent.

Warning: To avoid spills, empty the waste container at regular intervals.
Requirement: Prime all solvent lines with solvent to ensure that the degasser and the gradient proportioning valve function properly.

需要協助嗎?聯絡Waters專家。 


為避免引起人身傷害的風險和防止損壞實驗室設備,操作Waters產品時,請務必一律按照適用的操作和安全資訊,也務必遵守您所在組織的標準作業程序和當地法規。

回到頁首 回到頁首